ShubhHaiKya.com

Begin Construction — 14 Jul 2246

2246-07-14

← Begin Construction muhurat hub

46
Neutral

14 Jul 2246 is a neutral day for beginning construction. Proceed with caution.

Today is a mixed day for starting construction. Some elements are supportive. If the date is fixed, use the Abhijit Muhurat.

Next better day

15 Jul 224681/100 · Excellent

Today isn’t ideal — tap to check this date

Why this score

14 Jul 2246 scores 46/100 for Begin Construction — the Panchang reads as mixed for beginning construction. On this Tuesday, the lunar day is Pratipada (Shukla Paksha), the Nakshatra is Punarvasu, Yoga is Vyaghata, and Karana is Kimstughna. Together these elements shape whether tradition would green-light beginning construction right now.

Supporting signals: Favorable day of the week; Waxing moon period (Shukla Paksha). Friction points: Challenging energy period (Vyaghata yoga); Challenging lunar phase (Kimstughna). Rahu Kaal runs 3:00 PM–4:30 PM; most families avoid signing or finalising during that window. Abhijit Muhurat (11:36 AM–12:24 PM) is the most commonly used “safe” slot if you must proceed today.

If you can wait, the next stronger window is 15 Jul 2246 (score 81/100, Excellent). A common pattern: prepare paperwork on a Neutral/Avoid day, then close on a Good or Excellent date.

Positive Factors

  • Favorable day of the week
  • Waxing moon period (Shukla Paksha)

Negative Factors

  • Challenging energy period (Vyaghata yoga)
  • Challenging lunar phase (Kimstughna)
  • Rahu Kaal active 3:00 PM – 4:30 PM

Next Better Dates

Related Activities

Share

Frequently Asked Questions

Is on 14 Jul 2246 a good day for beginning construction?
Score: 46/100 — Neutral. Favorable day of the week
What is the best time for beginning construction on 14 Jul 2246?
The Abhijit Muhurat (11:36 AM – 12:24 PM) is considered the most auspicious time. Avoid Rahu Kaal (3:00 PM – 4:30 PM).
What are the negative factors for beginning construction on 14 Jul 2246?
Challenging energy period (Vyaghata yoga). Challenging lunar phase (Kimstughna). Rahu Kaal active 3:00 PM – 4:30 PM.
When is the next good day for beginning construction?
15 Jul 2246 scores 81/100 (Excellent).
Panchang Details
Tithi: Pratipada (Shukla)
Nakshatra: Punarvasu
Yoga: Vyaghata
Karana: Kimstughna
Rahu Kaal: 3:00 PM – 4:30 PM
Abhijit: 11:36 AM – 12:24 PM
Begin Construction on 14 Jul 2246 — Shubh Muhurat | ShubhHaiKya.com