7 Aug 2109 is a neutral day for beginning construction. Proceed with caution.
Today is a mixed day for starting construction. Some elements are supportive. If the date is fixed, use the Abhijit Muhurat.
Next better day
8 Aug 210972/100 · Good
Today isn’t ideal — tap to check this date
Why this score
7 Aug 2109 scores 44/100 for Begin Construction — the Panchang reads as mixed for beginning construction. On this Wednesday, the lunar day is Ekadashi (Shukla Paksha), the Nakshatra is Moola, Yoga is Vaidhriti, and Karana is Vishti. Together these elements shape whether tradition would green-light beginning construction right now.
Supporting signals: Favorable lunar day (Ekadashi); Waxing moon period (Shukla Paksha). Friction points: Challenging nakshatra (Moola); Challenging energy period (Vaidhriti yoga). Rahu Kaal runs 12:00 PM–1:30 PM; most families avoid signing or finalising during that window. Abhijit Muhurat (11:36 AM–12:24 PM) is the most commonly used “safe” slot if you must proceed today.
If you can wait, the next stronger window is 8 Aug 2109 (score 72/100, Good). A common pattern: prepare paperwork on a Neutral/Avoid day, then close on a Good or Excellent date.
Positive Factors
- Favorable lunar day (Ekadashi)
- Waxing moon period (Shukla Paksha)
Negative Factors
- Challenging nakshatra (Moola)
- Challenging energy period (Vaidhriti yoga)
- Challenging lunar phase (Vishti)
- Rahu Kaal active 12:00 PM – 1:30 PM
Next Better Dates
Related Activities
Frequently Asked Questions
- Is on 7 Aug 2109 a good day for beginning construction?
- Score: 44/100 — Neutral. Favorable lunar day (Ekadashi)
- What is the best time for beginning construction on 7 Aug 2109?
- The Abhijit Muhurat (11:36 AM – 12:24 PM) is considered the most auspicious time. Avoid Rahu Kaal (12:00 PM – 1:30 PM).
- What are the negative factors for beginning construction on 7 Aug 2109?
- Challenging nakshatra (Moola). Challenging energy period (Vaidhriti yoga). Challenging lunar phase (Vishti). Rahu Kaal active 12:00 PM – 1:30 PM.
- When is the next good day for beginning construction?
- 8 Aug 2109 scores 72/100 (Good).