ShubhHaiKya.com

Begin Construction30 Nov 1941

1941-11-30

← Begin Construction muhurat hub

55
Neutral

30 Nov 1941 is a neutral day for beginning construction. Proceed with caution.

Today is a mixed day for starting construction. Some elements are supportive. If the date is fixed, use the Abhijit Muhurat.

Next better day

3 Dec 194173/100 · Good

Today isn’t ideal — tap to check this date

Why this score

30 Nov 1941 scores 55/100 for Begin Construction — the Panchang reads as mixed for beginning construction. On this Sunday, the lunar day is Dwadashi (Shukla Paksha), the Nakshatra is Ashwini, Yoga is Variyan, and Karana is Bava. Together these elements shape whether tradition would green-light beginning construction right now.

Supporting signals: Supportive lunar phase (Bava); Waxing moon period (Shukla Paksha). Rahu Kaal runs 4:30 PM–6:00 PM; most families avoid signing or finalising during that window. Abhijit Muhurat (11:36 AM–12:24 PM) is the most commonly used “safe” slot if you must proceed today.

If you can wait, the next stronger window is 3 Dec 1941 (score 73/100, Good). A common pattern: prepare paperwork on a Neutral/Avoid day, then close on a Good or Excellent date.

Positive Factors

  • Supportive lunar phase (Bava)
  • Waxing moon period (Shukla Paksha)

Negative Factors

  • Rahu Kaal active 4:30 PM – 6:00 PM

Next Better Dates

Related Activities

Share

Frequently Asked Questions

Is on 30 Nov 1941 a good day for beginning construction?
Score: 55/100 — Neutral. Supportive lunar phase (Bava)
What is the best time for beginning construction on 30 Nov 1941?
The Abhijit Muhurat (11:36 AM – 12:24 PM) is considered the most auspicious time. Avoid Rahu Kaal (4:30 PM – 6:00 PM).
What are the negative factors for beginning construction on 30 Nov 1941?
Rahu Kaal active 4:30 PM – 6:00 PM.
When is the next good day for beginning construction?
3 Dec 1941 scores 73/100 (Good).
Panchang Details
Tithi: Dwadashi (Shukla)
Nakshatra: Ashwini
Yoga: Variyan
Karana: Bava
Rahu Kaal: 4:30 PM6:00 PM
Abhijit: 11:36 AM12:24 PM
Begin Construction on 30 Nov 1941 — Shubh Muhurat | ShubhHaiKya.com