2 Jan 1925 is a neutral day for beginning construction. Proceed with caution.
Today is a mixed day for starting construction. Some elements are supportive. If the date is fixed, use the Abhijit Muhurat.
Next better day
7 Jan 192589/100 · Excellent
Today isn’t ideal — tap to check this date
Why this score
2 Jan 1925 scores 48/100 for Begin Construction — the Panchang reads as mixed for beginning construction. On this Friday, the lunar day is Ashtami (Shukla Paksha), the Nakshatra is Revati, Yoga is Parigha, and Karana is Bava. Together these elements shape whether tradition would green-light beginning construction right now.
Supporting signals: Supportive lunar phase (Bava); Waxing moon period (Shukla Paksha). Friction points: Challenging energy period (Parigha yoga). Rahu Kaal runs 10:30 AM–12:00 PM; most families avoid signing or finalising during that window. Abhijit Muhurat (11:36 AM–12:24 PM) is the most commonly used “safe” slot if you must proceed today.
If you can wait, the next stronger window is 7 Jan 1925 (score 89/100, Excellent). A common pattern: prepare paperwork on a Neutral/Avoid day, then close on a Good or Excellent date.
Positive Factors
- Supportive lunar phase (Bava)
- Waxing moon period (Shukla Paksha)
Negative Factors
- Challenging energy period (Parigha yoga)
- Rahu Kaal active 10:30 AM – 12:00 PM
Next Better Dates
Related Activities
Frequently Asked Questions
- Is on 2 Jan 1925 a good day for beginning construction?
- Score: 48/100 — Neutral. Supportive lunar phase (Bava)
- What is the best time for beginning construction on 2 Jan 1925?
- The Abhijit Muhurat (11:36 AM – 12:24 PM) is considered the most auspicious time. Avoid Rahu Kaal (10:30 AM – 12:00 PM).
- What are the negative factors for beginning construction on 2 Jan 1925?
- Challenging energy period (Parigha yoga). Rahu Kaal active 10:30 AM – 12:00 PM.
- When is the next good day for beginning construction?
- 7 Jan 1925 scores 89/100 (Excellent).